Here are a few parts that have been built so far. We are gettign close to an actual assembly now.
12.31.2009
Software Installs
So here is the diagram of how we think all the software fits together.
The second diagram is from replicat.org and was very helpful for understanding How to take 3d designs from the computer to the electronics. One catch is that we didn't know we needed the usb-tty cable so after a few attempts to build one we decided to order it online. Hopefully it get's here before the end of the week. Yes it's a major set back but these types of things are expected. There is plenty of work here so we are just moving on.
The third image is just some install notes for all the software.
The second diagram is from replicat.org and was very helpful for understanding How to take 3d designs from the computer to the electronics. One catch is that we didn't know we needed the usb-tty cable so after a few attempts to build one we decided to order it online. Hopefully it get's here before the end of the week. Yes it's a major set back but these types of things are expected. There is plenty of work here so we are just moving on.
The third image is just some install notes for all the software.
2 Paths Under Development
Now that the base is complete. We are going to start down two paths of development. One path for the software and makerbot electronics and the second for machining and constructing the robot.
Software & Electronics assembly: prior to thinkaweek we gathered up all the hardware for the Ubuntu PC. We also installed Ubuntu and generally had it running. We also placed all of our electronics orders and hoped they would all show up by Christmas.
Robot Construction: Some of the machine work also started prior to thinkaweek but not all of it was done. The main parts to connect the Y axis to the A frames was started, also the Z axis blocks were almost ready. We still need to fit size and place everything so there are a ton of unknowns right now.
Software & Electronics assembly: prior to thinkaweek we gathered up all the hardware for the Ubuntu PC. We also installed Ubuntu and generally had it running. We also placed all of our electronics orders and hoped they would all show up by Christmas.
Robot Construction: Some of the machine work also started prior to thinkaweek but not all of it was done. The main parts to connect the Y axis to the A frames was started, also the Z axis blocks were almost ready. We still need to fit size and place everything so there are a ton of unknowns right now.
Making the Base 2
12.23.2009
Just catching up before the build starts
I thought I would just get some of the drawings, pictures, and notes into the blog as we prepare to build over the Christmas holiday. We have been scrounging and order parts since October in an attempt to have everything we might need to complete the printer by January 1, 2010.
In advance thanks to everyone that has contributed to the Reprap project. Your thinking makes us think.
In advance thanks to everyone that has contributed to the Reprap project. Your thinking makes us think.